A Line in the Mud
Millhaven RebuiltNoviceAbout 5–8 minutes of play
Forewoman Elin needs to know why the village’s last repair failed before another load of timber disappears into it.
- Given by
- Forewoman Elin
- Starts at
- Building Site
- Place in the story
- Main story
- To start
Construction 1- To finish
Construction 3- Suggested levels
Construction 3
Walkthrough
A part only moves on when you press Continue or Turn in, and the quest pays out when you press Claim. Work done before a part begins never counts towards it.
Part 1: Ask what failed
Meet Elin at the Building Site and review the village repair. Your workyard will serve as the planning and preparation point for the common hall.
- Talk at Building Site with Forewoman Elin: A repair worth understanding
“We replaced the boards twice,” Elin says. “I will not ask for a third cart until someone can explain what moved.”
Part 2: Read the ground
Compare the stockpile’s runoff with the hall footing drawn on Elin’s worktable. Record both observations in the surveyor’s journal.
- Inspect at Quarry: Inspect the runoff channel
A fresh ribbon of pale silt runs from the quarry stockpile toward the low ground. The uphill paving is dry; the downhill edge has sunk.
- Inspect at Building Site: Inspect Elin’s survey
The old beam remains straight. Its lower post has dropped two finger-widths; the floor tilts toward a blocked drain. No char or cut marks are present.
Part 3: Name the first repair
Use the evidence to choose what must happen before a new frame is raised. Construction 3 is required to sign off the survey.
Before this part can go on:
Construction 3.
- Puzzle at Building Site: What should be repaired first?
The beam is straight, the low post has sunk, and rainwater cannot leave the footing. Which repair addresses the cause?
Choose one:
- Replace every roof board
- Clear the drain and stabilise the low footing
- Post another night guard
Show the hints
- The damage follows the water, not the roof.
- Clear the blocked drain and give the settled post a stable footing.
Show the solution
Clear the drain and stabilise the low footing
Rewards
- 250 ×
Coins - 200
Construction XP
Show how the quest ends
Elin rolls up the survey. “Now we can spend effort where it matters.” A timber repair and a masonry repair are both available; either can establish a safe footing.