MedIdle Wiki Play MedIdle

Raising Day

Millhaven RebuiltNoviceAbout 6–10 minutes of play

With one repair method proven, organise the frame and give the village a dependable place to gather.

Starts at
Building Site
Place in the story
Main story
To start
either Timber With a Memory finished or The Mason’s Measure finished and Construction 10
To finish
Construction 12
Suggested levels
Construction 12

Walkthrough

A part only moves on when you press Continue or Turn in, and the quest pays out when you press Claim. Work done before a part begins never counts towards it.

Part 1: Show a sound workyard

Elin uses your own house’s first completed wall as the crew’s training example. Existing completed walls qualify; nobody asks you to tear them down and rebuild them.

  • Have Walls stage 1 or higher completed at your house. (Walls stage 1; counts at once if it is already built)

Part 2: Plan the lift

Use Elin’s plan to organise the communal frame lift at the Building Site.

  • Puzzle at Building Site: Order the raising crew

    Elin’s rule is written on the plan: brace the standing posts before the frame is lifted; pin it only after it is upright; remove the lifting tackle after it is pinned.

    Put these in the right order:

    • Brace the standing posts
    • Raise the frame
    • Pin the upright frame
    • Remove the lifting tackle
    Show the hints
    1. The posts need support before the frame moves.
    2. Brace → raise → pin → remove tackle.
    Show the solution
    1. Brace the standing posts
    2. Raise the frame
    3. Pin the upright frame
    4. Remove the lifting tackle

Part 3: Hand the plan to the crew

At Construction 12, sign the completed lift plan and ask what the village still needs.

Before this part can go on: Construction 12.

  • Talk at Building Site with Forewoman Elin: The frame is standing

    “A sound frame is only half the work,” Elin says. “We should make room for the people who cannot spend all day on their feet.”

Rewards

Show how the quest ends

The common hall has its frame. An optional comfort project and the final roof charter are both available.