MedIdle Wiki Play MedIdle

Give the Stream Its Bed

The Wellspring AccordIntermediateAbout 6–9 minutes of play

Repair the runoff route so the spring reaches the fields without passing through the ash store.

Given by
Keeper Bran
Starts at
Fields
Place in the story
Main story
To start
either Roots Before Rain finished or Glass and Leaf finished and Construction 8
To finish
Construction 10
Suggested levels
Construction 10

Walkthrough

A part only moves on when you press Continue or Turn in, and the quest pays out when you press Claim. Work done before a part begins never counts towards it.

Part 1: Read the repair plan

At the Building Site, Bran marks a temporary bypass, a blocked outlet and a clean return channel. The crew needs water out of the old channel before it opens the obstruction.

  • Inspect at Building Site: Inspect the bypass plan

    A temporary side channel can carry the spring while the old outlet is cleared. The upstream inlet controls the flow. The crew must establish the bypass before opening the inlet again.

Part 2: Repair in a controlled order

Bring the fixed material bundle for the repair and choose the order of work. The materials will be used when you hand the completed plan to the crew; revising the plan costs nothing.

  • Hand over 3 mortar and 6 planks. (3 × Mortar, 6 × Plank, handed in at Fields; the items are taken)
  • Puzzle at Fields: Order the channel repair

    Bran’s plan requires a closed inlet before work, a bypass before clearing the old outlet, and a clear lined outlet before flow returns.

    Put these in the right order:

    • Close the upstream inlet
    • Establish the temporary bypass
    • Clear and line the old outlet
    • Restore the controlled flow
    Show the hints
    1. Control the water before asking the crew to work in its channel.
    2. Close inlet → establish bypass → clear and line outlet → restore flow.
    Show the solution
    1. Close the upstream inlet
    2. Establish the temporary bypass
    3. Clear and line the old outlet
    4. Restore the controlled flow

Part 3: Record the new route

At Construction 10, inspect and sign the completed channel record.

Before this part can go on: Construction 10.

  • Inspect at Fields: Record the restored channel

    The repaired outlet follows Bran’s marked line and leaves the ash-store ditch isolated from the irrigation flow. Record the new route as the baseline for future inspections.

Rewards

Show how the quest ends

The stream has a clear route. Bran offers an optional shared-garden project and asks you to help write a lasting agreement for its use.